US$ 647.50
Pay in 4 interest-free payments of $8.00 Learn more
Multiple port connections for _" 316 Stainless SAE 37 Degree
A dry ice coil was used in between the output port of the pump and the recovery cylinder to condense vapor
Wear appropriate PPE
Branch Tee
***Note: Do not run fans daisy-chained it will cause disruption with air circulation and may cause the fan to back up air into the room
BVV Recovery Pump Top Dead Center Piston Calibration Plate Wiped Film Multiple port connections for _"BVV Butane Recovery Pumps Top Dead Center Calibration Plate & Bolts Use with the Top Dead Center Clearance (TDCC) instructions Use this plate and a depth gauge to measure the Top Dead Center Clearance of the piston cylinder head assembly. Shims that come with the piston cylinders are stacked to create an area of displacement between the top of the cylinder and the compressor head. BVV's Recommended depth is 0. 012" for the BVV 4 & 2 Cylinder Butane
US$ 647.50
US$ 422.50
US$ 1072.50
US$ 1072.50