US$ 50.00
Pay in 4 interest-free payments of $3.30 Learn more
due to them being difficult to demolish
Stretcher bond red brick
An Inspection Pit (Peco LK-56/156) was also often provided
such as CCTV cameras
Layout plans suggestions can be found in our publications 'Track Plans for Layouts to Suit all Locations' (Ref PM-202)
KNR258 - PECO - N - SR 20 Ton Sleeper Wagon (was PN08) On30 due to them being difficultIntroduced in 1928 (diagram 1771), and still in service carrying a wide variety of Civil Engineer's materials on BR Southern Region. These finely moulded plastic wagon kits come complete with pin point axle wheels. Glue and paint will be required, along with appropriate transfers .