Tekpac Lighting Tower manual Run time at half load
Description
Run time at half load (hrs): 15
This machine is supplied without a blade
A compact but highly practical high-lift fire pump
Supplied with 4 stability outriggers - 2 rear/2 side
Starting Power: 4
Tekpac Lighting Tower manual Run time at half loadThis towable lighting tower is versatile whether you're working on a construction site, in the hire business or hosting an outdoor event. Fitted with 4x 300W LED light panels (each with 4 separate LED's) Max. Height (Fully Extended): 9m Electric mast winch Galvanised steel telescopic mast Weight: 860kg Voltage: 220V Kubota Z482 diesel engine Stamford alternator External power supply can be used as a generator during the day or night Lights can be
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
You may also like
US$ 55.00
US$ 120.00
US$ 99.95
US$ 120.00
US$ 127.50





